MAJiK Systems

#Downtime

Manufacturing intelligence insights

OEE split into Availability, Performance and Quality to find the loss to fix first
OEE

How to Use OEE to Find and Fix Losses That Matter

OEE shows how effectively scheduled production time was used, not how much you made. See what OEE is, what it is not, and how to use it to find and fix the losses that matter.

Adam Singer7 min read
Live OEE replacing an end-of-shift spreadsheet on a packaged-goods line
OEE

From spreadsheets to live OEE: a 90-day shop floor rollout

How a packaged-goods producer moved from end-of-shift recaps to live, shop-floor-visible performance without replacing a controller.

Jeff MacLeod4 min read
Short, frequent stops adding up across a producing shift on a downtime chart
Downtime

Downtime: why the five-minute stop is the expensive one

Short, frequent stops rarely get logged, yet they often cost more than the big breakdown everyone remembers.

Adam Singer4 min read